Masonry support system at Big Wood School
Description

Big Wood Secondary School in Nottingham is situated on the edge of Bestwood Country Park, with approximately 750 pupils aged between 11 and 16 currently on the roll. As part of the UK Government’s Building Schools for the Future initiative, the school is being completely rebuilt and the first phase of the £18 million development, the construction of three two-storey rectangular teaching blocks (about 40 m x 20 m in plan), was opened in the autumn of 2009. The buildings are brick-clad, structural steelwork frames, with composite floors. The brickwork is supported by a stainless steel masonry support system over the windows (some are in excess of 9 m wide). The support system provides a horizontal ledge for the masonry and is fixed to rectangular hollow edge beams.

Date
2010
Provider
Team Stainless
Download